The Red Wind Casino, a longtime customer of MacDonald-Miller, had their grand opening of their newly expanded non-smoking casino in spring 2015. The original casino, which first opened in 2005, partnered with MacMiller to design, build and install the mechanical HVAC and plumbing systems. With project management on site after completion of the new construction…
-
-
FLIR
This Energy Trust of Oregon project was originally envisioned by Mike Smith of Energy 350, an outfit contracted by the industrial arm of the Energy Trust to ensure utility clients have easy access to quality energy consulting. Mike introduced the concept of Catalyst rooftop optimization to FLIR, which led to the discovery of additional efficiency…
-
Columbia Sportswear
Our partnership with Columbia Sportswear began with a dynamic interplay between our Service Department, Building Performance Group (BPG) and Service Special Projects (SSP) teams, which made serving this client a seamless, enjoyable undertaking. MacDonald-Miller launched the adventure in 2015 with a service agreement, and immediately recognized that Columbia Sportswear had other needs. We called in…
-
Stratus
Stratus is a 45-story, 396-unit residential tower located across from Amazon’s main campus. This project follows on the heels of the recently completed 2030 8th Ave project, part of the initiative to meet the demand for additional housing in the rapidly expanding SLU/Denny Triangle neighborhood. On April 8th, 2017, months of planning, coordination, and shop…
-
Echonous
Pattison General Contractor selected MacDonald-Miller for the HVAC design and construction of their 2-story, 27,000 SF build-out for Echonous in Redmond. Echonous is working to shrink ultrasound technology into portable hand-held technology, essentially miniaturizing proven healthcare technology. Their first floor is packed with essential laboratory equipment, and the second floor is filled with office spaces…
-
Seattle Genetics
The Seatte Genetics project consists of a 22,410 SF Lab, 26,481 SF Office, 48,000 SF Interstitial Floor for MEP Systems and Mechanical Rooms. The construction requirements were very aggressive with a ten-month duration. At project inception, we trenched new underground plumbing utilities and installed over 100 plumbing stub ups. The GC installed a steel structure second…
-
Plymouth Housing Group
When Plymouth Housing Group needed critical plumbing, HVAC and lighting for their properties, they turned to MacDonald-Miller to complete their energy conservation measures. Projects scope includes: Lighting fixture retrofits with long life fluorescents and LED lamps, lighting fixture replacements with LED fixtures that incorporate motion and daylight sensing controls to adjust lighting levels based on activity…
-
500 Fairview
This biotech design-assist project consists of seven stories of laboratory and office space for South Lake Union tenants, Novo Nordisk, Nanostring, and Silverback Therapeutics; and ties into an existing 98,000 SF five-story structure located at 530 Fairview. This new construction project also boasts 58,000 SF of underground parking. Full mechanical scope includes sheet metal, piping,…
-
Google Campus – Phase 2
Google Phase 2 is a 2-story 180,000 SF office facility adjacent to Google’s existing Kirkland campus. There are two full levels of parking beneath the building containing 720 parking spots. As is common with many Google facilities there are a plethora of amenities including a rooftop deck, gym, sports fields, full service cafeteria, and sky…
-
Avalara Hawk Tower
The North Lot project is located in Seattle’s historic Pioneer Square and consists of a 23-story North Hotel Tower and a 19-story South Office Tower connected by an 8-story arcade/atrium that includes two sky bridges to connect both towers. The project includes a convention center, health/fitness facility with a swimming pool, multiple restaurant/retail spaces, one full…