MacDonald-Miller
    • Home
    • Design
      • Back
      • Engineering
      • Estimating
      • Detailing
      • Preconstruction
      • Integrated Project Delivery
    • Build
      • Back
      • Project Management
      • Prefabrication Shop
      • Special Projects
      • New Construction
    • Optimize
      • Back
      • Smart Building Services
      • Chiller Services
      • Plumbing Services
      • Electrical Services
      • Building Controls
      • Tab & Commissioning
      • Clean Buildings
      • Public Contracting
    • Projects
    • News
      • Back
      • News
      • Videos
      • Newsletters
    • About
    • Careers
      • Back
      • Overview
    • Contact
      • Back
      • Contact
    • Locations
    • Search
MacDonald-Miller
  • Services
    • HVAC Service & Maintenance
      • Smart Maintenance
        • Indoor Air Quality
      • Electrical Services
      • Plumbing Services
    • Building Performance
      • Building Controls
      • TAB & Commissioning
      • Energy Savings
        • Clean Buildings
        • ESCO & Financing
        • Public Contracting
    • Service Special Projects
      • Special Projects Service
        • Boiler
        • Chiller
      • Tenant Improvement & Retrofits
      • Equipment Repairs
  • Projects
  • News
  • About
  • Careers
  • Contact

Archive Archives

  • Colwell Apartment

    Plymouth Housing Group

    When Plymouth Housing Group needed critical plumbing, HVAC and lighting for their properties, they turned to MacDonald-Miller to complete their energy conservation measures. Projects scope includes: Lighting fixture retrofits with long life fluorescents and LED lamps, lighting fixture replacements with LED fixtures that incorporate motion and daylight sensing controls to adjust lighting levels based on activity…

  • 500 Fairview

    500 Fairview

    This biotech design-assist project consists of seven stories of laboratory and office space for South Lake Union tenants, Novo Nordisk, Nanostring, and Silverback Therapeutics; and ties into an existing 98,000 SF five-story structure located at 530 Fairview. This new construction project also boasts 58,000 SF of underground parking. Full mechanical scope includes sheet metal, piping,…

  • Google Campus

    Google Campus – Phase 2

    Google Phase 2 is a 2-story 180,000 SF office facility adjacent to Google’s existing Kirkland campus. There are two full levels of parking beneath the building containing 720 parking spots. As is common with many Google facilities there are a plethora of amenities including a rooftop deck, gym, sports fields, full service cafeteria, and sky…

  • North Lot

    Avalara Hawk Tower

    The North Lot project is located in Seattle’s historic Pioneer Square and consists of a 23-story North Hotel Tower and a 19-story South Office Tower connected by an 8-story arcade/atrium that includes two sky bridges to connect both towers. The project includes a convention center, health/fitness facility with a swimming pool, multiple restaurant/retail spaces, one full…

  • Montgomery Park

    Montgomery Park

    The 850,540 square foot Montgomery Park is a commercial building in Portland, Oregon, housing approximately 26 tenants with about 3,000 people occupying the building during an average workday. Work included condenser pumps, supply fan VFD’s, and variable fan speed (Catalyst) on all large tonnage heat pumps.  Through bill savings from the lighting upgrades and Energy Trust…

  • UW multi-trade racks

    University of Washington – Research Facility

    The University of Washington will soon have a state-of-the-art-facility that will further advances in science and medicine and create a more centralized, efficient and flexible facility to address current and future research needs. With over 270,000 LBS of duct and 50,000 LF of pipe packed into two interstitial spaces, it’s a fine-tuned machine that took…

  • Laboratory

    Polyclinic & Swedish Health Services

    The Polyclinic and Swedish Health Services recently joined forces to construct a state-of-the-art ambulatory surgery center (ASC) in the heart of the First Hill district. Complete with ten operating rooms and two eye procedure rooms, this new facility is the largest ASC in the United States. Full design and installation of a complete HVAC, plumbing, medical…

  • Swedish Perkins

    Swedish First Hill

    This redevelopment of two blocks of the existing campus will boast more than 1,300,000 SF of space.  Northwest Tower, a new 17-story procedural center, will house emergency services, a cafeteria, 37 operating suites, sterile processing, critical care, and support services.  Block 95 will be a new 5-story medical office building housing a central emergency power…

  • Lincoln Square Expansion

    Lincoln Square – Expansion Phase 2

    The new 1.5 million square feet, mixed-use development in the heart of downtown Bellevue will provide visitors Class A offices, including 6 floors of well-designed underground parking, luxury residences, new hotel, upscale retail-driven restaurants and 16 cinemas. The central plant consists of (4) 750-ton centrifugal water chillers that are interconnected with the 3,000-ton cooling tower located…

  • Virginia Mason

    Virginia Mason – Jones Pavilion

    The new Jones Pavilion is located on Seneca Street just east of Virginia Mason Hospital. The 18-story 362,000 square foot addition features a new Emergency Department, ICU, CCU Acute Care, and Surgeries. Primary design objectives called for system flexibility. For this project, the design team adopted the “Set Based Design” concept to converge on optimal…

  • «
  • 1
  • …
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • »

We make buildings work better.

Customer Login   Employee Login
© 2025 MacDonald-Miller. All rights reserved.