MacDonald-Miller
    • Home
    • Design
      • Back
      • Engineering
      • Estimating
      • Detailing
      • Preconstruction
      • Integrated Project Delivery
    • Build
      • Back
      • Project Management
      • Prefabrication Shop
      • Special Projects
      • New Construction
    • Optimize
      • Back
      • Smart Building Services
      • Chiller Services
      • Plumbing Services
      • Electrical Services
      • Building Controls
      • Tab & Commissioning
      • Clean Buildings
      • Public Contracting
    • Projects
    • News
      • Back
      • News
      • Videos
      • Newsletters
    • About
    • Careers
      • Back
      • Overview
    • Contact
      • Back
      • Contact
      • Locations
    • Search
MacDonald-Miller
  • Services
    • HVAC Service & Maintenance
      • Smart Maintenance
        • Indoor Air Quality
      • Electrical Services
      • Plumbing Services
    • Building Performance
      • Building Controls
      • TAB & Commissioning
      • Energy Savings
        • Clean Buildings
        • ESCO & Financing
        • Public Contracting
    • Service Special Projects
      • Special Projects Service
        • Boiler
        • Chiller
      • Tenant Improvement & Retrofits
      • Equipment Repairs
  • Projects
  • News
  • About
  • Careers
  • Contact

Archive General

  • Steamwork

    We’re all about the (S)Teamwork

    Special Projects: Financial Center MacDonald-Miller was working on York chillers at the Puget Sound Plaza building when our customer approached us about a steam work project at another one of their buildings. A steam study report by Northwest Energy Consulting recommended replacing all the HVAC electric heating in the facility. By replacing their electric boiler,…

  • MIU East Lab

    MIU East Lab Project

    Leveraging constant communications – MIU East Lab Q & A McLean Webster, Project Manager, takes a break from his busy day as project manager to share some insight into our work at a telecommunications lab in Bellevue, WA. Q: All projects have challenges. What issues are being overcome for this specific job? A: The uniqueness…

  • Boiler

    BOILING OVER WITH INGENUITY

    Boiler Project: PeaceHealth The PeaceHealth Sacred Heart Medical Center at RiverBend boiler project consists of retrofitting two 800hp Superior Boilers and installing a third new 800hp Hurst boiler. We are installing state of-the-art Limpsfield burners that are guaranteed to operate at 3% O2 emissions (15% excess air). That means they are very efficient and will provide…

  • Da Vinci Middle School

    Portland Public Schools

    Energy Savings Project: Portland Public Schools MacDonald-Miller began working with Portland Public Schools (PPS) in 2015, commencing with Da Vinci Middle School. The first project was a small controls retrofit that entailed replacing antiquated motors and doing VFD upgrades. We also replaced the existing building automation system with a non-proprietary Honeywell WEBS DDC system. As that…

  • Townhall

    Town Hall Historic Renovation

    . Construction Special Projects: Making our mark at a landmark After a century of use, a Seattle landmark venue is getting an overhaul. Town Hall is a non-profit performance theatre that provides affordable accessibility for its programs and community. The historic building was built during the peak of the Christian Science movement between 1916-1922 for the…

  • Service Technician

    Take the Preventive Approach with Maintenance

    Preventive Maintenance We know that high-efficiency equipment requires the execution of specific preventive maintenance tasks in order to operate at peak performance. Why wait for reactive service, when a preventive maintenance plan eliminates surprises and provides reliable comfort! Benefits Eliminates catastrophic equipment failures Extends the operation life of machine components Reduces the cost of parts and…

  • OBM brand story

    Portland Public Schools Ramp Up Efficiency

    Facility upgrades improve schools’ budgets and indoor air quality while reducing emissions Source: Oregon Business Magazine Portland’s public schools are 70 years old, on average. Many of these buildings utilize antiquated control systems to regulate temperature and airflow. Older, pneumatic-powered systems require an in-person maintenance trip, costing the schools time and money. These maintenance trips…

  • MLAB Logo

    MacDonald-Miller Launches MLAB

    PRESS RELEASE: Virtual reality brings projects to life before they are built. SEATTLE, Wash., September 18, 2018 – Local mechanical contractor, MacDonald-Miller Facility Solutions, now offers clients the ability to experience their project before it’s even built through virtual reality (VR). The MLAB at MacDonald-Miller is a 750 sq. foot space dedicated to virtual reality that…

  • wall street journal

    The Wall Street Journal Features MacMiller

    In the World of Smart Buildings, the Future Is Already Here For facility managers, a building is more than a set of walls, floors and windows. It’s a living organism made up of dozens of overlapping systems, from the vents pumping cool air to the array of pipes and electrical cables tucked overhead and underfoot….

  • STEM Teachers

    West Sound STEM Network at MacMiller

    Share from Washington STEM: Computer Science Catalyzes Career Connected Learning in the West Sound STEM Region: Education-Industry Partnerships for a Future Ready Washington. The age-old question for students in math classes – we’ve all heard it, we’ve all probably even said it. “But what am I going to actually DO with what I’m learning?” Teachers go…

  • «
  • 1
  • …
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • …
  • 38
  • »

We make buildings work better.

Customer Login   Employee Login
© 2025 MacDonald-Miller. All rights reserved.