Our scope of work for this cutting edge broadcasting station located at Home Plate Center included design, MEP detailed coordination, plumbing/sheet metal/fitting/electrical installation, controls building management infrastructure, Test and Balance, and service. Faced with a narrow 45-day window to go from napkin-sketched conceptual design to fully coordinated permit drawings for all consultant trades, the capabilities…
-
-
Hyatt Regency
Specifically designed to complement the soon-to-be expansion of the Washington State Convention Center, 8th & Howell’s completion will provide 1,264 luxury hotel rooms to visiting guests. The hotel will include underground parking, street-level restaurants and retail, as well as a 7-story podium level featuring banquet and ballroom space, high-end meeting rooms, and a banquet-capacity commercial…
-
B/E Aerospace
We highly value our partnership with B/E Aerospace, the world’s leading manufacturer of aircraft cabin interior products. They design, develop and manufacture a broad range of products for both commercial aircraft and business jets.The B/E Aerospace project is an upgrade to the newly built facility, which serves to accommodate the move of their FSI Group…
-
Seattle Central College
Recently, MacMiller helped Seattle Central College with a campus-wide retrofit totaling over 4 million dollars in ESCO contracts with Ameresco. Projects with MacMiller included a complete upgrade of over 300 steam and chilled water valves, converting the pneumatic controls system to the Honeywell Tridium platform, and building a customized ICONICS dashboard with fault detection diagnostics….
-
Seattle Aquarium
The Seattle Aquarium is a 69,400 square foot facility that originally opened in 1977. It houses multiple aquatic and land exhibits, a restaurant, gift shop and a meeting/event space. The project scope included an Investment Grade Audit that resulted in energy efficient retrofits and new equipment including: a new HVAC Controls system, an LED lighting,…
-
Renaissance Hotel
The 350,000 square foot Renaissance Hotel was constructed in 1981 and has 553 guest rooms, 18 meeting rooms, and 3 restaurants. The project scope included reinstalling heat wheels, modification of kitchen EF roof ducting, retrofitting kitchen hoods to VFD, garage lighting upgrades, domestic water pump system replacement, connection of meeting room heat pumps to the…
-
Key Center
Key Center Bellevue is a 526,131 square foot Class A office tower. It includes 22 stories and 800 underground parking spaces and was built in 2000. The building has a built-up rooftop system with water-cooled central cooling plant and terminal FPVAV with electric heat. The scope of this project included an energy audit, control system…
-
Highline College
The Highline College energy project affected 571,356 square feet of the campus. The project included upgrading the campus-wide building automation system backbone, retro-fitting the remaining two boilers with Exhaust Gas Analyzing controls, upgrading and customizing the exterior lighting fixtures. The energy savings components of the Building 4 FAA noise abatement remodel and performance management services…
-
Bellevue City Hall
Bellevue City Hall is a 391,839 square foot Facility originally built in 1982. The Facility currently supports the City of Bellevue’s City Administration, Regional 911 Call Center, Council Chambers, Department of Planning and Police Headquarters. The utility conservation project included the installation of 234 garage and stairwell lighting fixtures with occupancy sensors, building automation system…
-
Washington Athletic Club
The Washington Athletic Club was built in 1930 and expanded in 1955 and 1969. The 21 story 310,000 square foot steel and masonry structure contain 113 hotel guest rooms and 5 floors of fitness amenities, with support areas that operate 24/7. The project included replacing and integrating a legacy control system with a new BACnet…