For this historical tenant improvement in the Maritime Building in downtown Seattle, MacDonald-Miller provided a new VAV system, DDC Controls and self-performed NEBB certified air balancing for Big Fish Games’ 5-story project. The plumbing scope included restrooms, hospitality bar and kitchenette, and MacMiller led a coordinated BIM process that included a highly collaborative detailing process…
-
-
Boeing – Air Manifold
MacDonald-Miller recently refurbished two fuselage air manifolds for The Boeing Company. The existing refurbished manifolds provide full scale fatigue testing for Boeing’s 777-200 and 787-8 line of aircraft manufactured in Washington State. Each manifold supplies pressured air to aircraft fuselage that goes through a pressurization / depressurization cycle once per flight. The air will be…
-
WeWork
For this 3-story tenant improvement project in Portland’s historic Power and Light Building, MacDonald-Miller had to respond quickly to propose, design and immediately start work to accommodate WeWorks’ tight deadline. Our HVAC scope of work includes a 4-pipe heating hot water and chilled waterfan coil units. We will implement in-house Honeywell controls, and the design…
-
Emerald Services Brighton Facility
Service Special Projects The Emerald Services Brighton Facility, owned by Safety Clean and Clean Harbors, hired MacDonald-Miller to transform a decommissioned oil storage facility into an oil recycling hub. Using 8 existing gear reduction pumps, railcars bring oil into the farm, filling the 10,000 gallon tanks. Valving then shifts pumping the oil from the tanks…
-
Red Wind Casino Expansion
The Red Wind Casino, a longtime customer of MacDonald-Miller, had their grand opening of their newly expanded non-smoking casino in spring 2015. The original casino, which first opened in 2005, partnered with MacMiller to design, build and install the mechanical HVAC and plumbing systems. With project management on site after completion of the new construction…
-
Columbia Sportswear
Our partnership with Columbia Sportswear began with a dynamic interplay between our Service Department, Building Performance Group (BPG) and Service Special Projects (SSP) teams, which made serving this client a seamless, enjoyable undertaking. MacDonald-Miller launched the adventure in 2015 with a service agreement, and immediately recognized that Columbia Sportswear had other needs. We called in…
-
Google Campus – Phase 2
Google Phase 2 is a 2-story 180,000 SF office facility adjacent to Google’s existing Kirkland campus. There are two full levels of parking beneath the building containing 720 parking spots. As is common with many Google facilities there are a plethora of amenities including a rooftop deck, gym, sports fields, full service cafeteria, and sky…
-
Avalara Hawk Tower
The North Lot project is located in Seattle’s historic Pioneer Square and consists of a 23-story North Hotel Tower and a 19-story South Office Tower connected by an 8-story arcade/atrium that includes two sky bridges to connect both towers. The project includes a convention center, health/fitness facility with a swimming pool, multiple restaurant/retail spaces, one full…
-
Seattle Sheraton Boiler Retrofit
This premiere Seattle hotel was concerned with their boilers cycling off/on, which was causing temperature fluctuations and decreased efficiency. Their ultimate goal, of course, was to increase the efficiency of the boiler plant and bolster energy/utility savings. MacDonald-Miller provided a state of the art solution utilizing Limpsfield burners and Autoflame linkage less control. This combination…
-
King 5
Our scope of work for this cutting edge broadcasting station located at Home Plate Center included design, MEP detailed coordination, plumbing/sheet metal/fitting/electrical installation, controls building management infrastructure, Test and Balance, and service. Faced with a narrow 45-day window to go from napkin-sketched conceptual design to fully coordinated permit drawings for all consultant trades, the capabilities…