MacDonald-Miller
    • Home
    • Design
      • Back
      • Engineering
      • Estimating
      • Detailing
      • Preconstruction
      • Integrated Project Delivery
    • Build
      • Back
      • Project Management
      • Prefabrication Shop
      • Special Projects
      • New Construction
    • Optimize
      • Back
      • Smart Building Services
      • Chiller Services
      • Plumbing Services
      • Electrical Services
      • Building Controls
      • Tab & Commissioning
      • Clean Buildings
      • Public Contracting
    • Projects
    • News
      • Back
      • News
      • Videos
      • Newsletters
    • About
    • Careers
      • Back
      • Overview
    • Contact
      • Back
      • Contact
    • Locations
    • Search
MacDonald-Miller
  • Services
    • HVAC Service & Maintenance
      • Smart Maintenance
        • Indoor Air Quality
      • Electrical Services
      • Plumbing Services
    • Building Performance
      • Building Controls
      • TAB & Commissioning
      • Energy Savings
        • Clean Buildings
        • ESCO & Financing
        • Public Contracting
    • Service Special Projects
      • Special Projects Service
        • Boiler
        • Chiller
      • Tenant Improvement & Retrofits
      • Equipment Repairs
  • Projects
  • News
  • About
  • Careers
  • Contact

Archive Archives

  • Cascade Manor

    Cascade Manor is a non-profit retirement community based in Eugene, Oregon. They wanted to take a proactive approach to address employee and resident health concerns as it relates to HVAC, plumbing and overall safety during the pandemic. A variety of work was done including preventative maintenance by replacing small pumps, servicing the chillers, and servicing…

  • Ovation Towers Seattle, Tim Rice Photography

    Ovation Towers

    Ovation Towers (Spring Street North block) are two twin residential towers in Seattle WA sporting 765,288 square feet of space. Each stand at 31 floors high with street and roof top amenity spaces, 558 apartment units, 8 floors of underground parking, and shell core space at street level for future office, restaurant, and retail. In…

  • Suncadia Resort

    MacDonald-Miller completed tenant improvements for the kitchen, Pro Shop, and boiler upgrades for this deluxe resort. Additional scope included chiller and boilers repairs for the Lodge at Suncadia and 15 small boilers for the Suncadia Swim & Fit Center.

  • Yakama Nation Legends Casino & Hotel

    The Yakama Nation Legends Casino and Hotel project consisted of 4 phases. The hotel scope of work for Phase 1 consists of 200 guest rooms served by vertical fan coil units fed by an air-cooled chiller, a shell and core spa fed by horizontal fan coil units and a pool area. A mechanical room on…

  • Stratus Building

    Stratus

    Stratus is a 45-story, 396-unit residential tower located across from Amazon’s main campus. This project follows on the heels of the recently completed 2030 8th Ave project, part of the initiative to meet the demand for additional housing in the rapidly expanding SLU/Denny Triangle neighborhood. On April 8th, 2017, months of planning, coordination, and shop…

  • Colwell Apartment

    Plymouth Housing Group

    When Plymouth Housing Group needed critical plumbing, HVAC and lighting for their properties, they turned to MacDonald-Miller to complete their energy conservation measures. Projects scope includes: Lighting fixture retrofits with long life fluorescents and LED lamps, lighting fixture replacements with LED fixtures that incorporate motion and daylight sensing controls to adjust lighting levels based on activity…

  • Seattle Sheraton Boiler Retrofit

    Seattle Sheraton Boiler Retrofit

    This premiere Seattle hotel was concerned with their boilers cycling off/on, which was causing temperature fluctuations and decreased efficiency. Their ultimate goal, of course, was to increase the efficiency of the boiler plant and bolster energy/utility savings. MacDonald-Miller provided a state of the art solution utilizing Limpsfield burners and Autoflame linkage less control. This combination…

  • 8th Howell Exterior

    Hyatt Regency

    Specifically designed to complement the soon-to-be expansion of the Washington State Convention Center, 8th & Howell’s completion will provide 1,264 luxury hotel rooms to visiting guests. The hotel will include underground parking, street-level restaurants and retail, as well as a 7-story podium level featuring banquet and ballroom space, high-end meeting rooms, and a banquet-capacity commercial…

  • Alley

    Alley 111

    Alley 111 is a 12-story condominium, with 260 apartments and 6,222 square feet of retail space in the heart of downtown Bellevue. The HVAC system is a stacked vertical heat pump system. The roof top amenities area and the main lobby are served by heat pumps. Future retail and restaurant space is at street level…

  • Construction

    Cirrus

    The 2030 8th Avenue building is a 43-story high-rise, 354-unit apartment tower located in the rapidly growing South Lake Union area. The residential units are served by a two-pipe vertical chilled water fan coil system with electric heat fed from two 235-ton rooftop chillers. The plumbing system includes 224,564 lineal feet of pipe, with a…

We make buildings work better.

Customer Login   Employee Login
© 2025 MacDonald-Miller. All rights reserved.