MacDonald-Miller
    • Home
    • Design
      • Back
      • Engineering
      • Estimating
      • Detailing
      • Preconstruction
      • Integrated Project Delivery
    • Build
      • Back
      • Project Management
      • Prefabrication Shop
      • Special Projects
      • New Construction
    • Optimize
      • Back
      • Smart Building Services
      • Chiller Services
      • Plumbing Services
      • Electrical Services
      • Building Controls
      • Tab & Commissioning
      • Clean Buildings
      • Public Contracting
    • Projects
    • News
      • Back
      • News
      • Videos
      • Newsletters
    • About
    • Careers
      • Back
      • Overview
    • Contact
      • Back
      • Contact
    • Locations
    • Search
MacDonald-Miller
  • Services
    • HVAC Service & Maintenance
      • Smart Maintenance
        • Indoor Air Quality
      • Electrical Services
      • Plumbing Services
    • Building Performance
      • Building Controls
      • TAB & Commissioning
      • Energy Savings
        • Clean Buildings
        • ESCO & Financing
        • Public Contracting
    • Service Special Projects
      • Special Projects Service
        • Boiler
        • Chiller
      • Tenant Improvement & Retrofits
      • Equipment Repairs
  • Projects
  • News
  • About
  • Careers
  • Contact

Archive Archives

  • 12 Tribes Omak Casino Hotel

    2 Tribes Omak Casino Hotel started experiencing hot water issues shortly after being built in 2015. When MacDonald-Miller took over the maintenance contract in early 2019, we were aware of the hotel’s hot water inconsistency. Through discussions, we determined that the best way to proceed was to have our plumbing engineer and field lead perform…

  • Wenatchee Valley College

    The Wenatchee Valley College project consists of working directly with the college to replace fan coil units in Batjer Hall classrooms and offices, replacing and upgrading gas-fired condensing boilers serving the Eller-Fox Science Building, Wells Hall, and the Brown Library. There are also upgrades to split system heat pumps in the Smith Gym and a…

  • Samaritan Albany General Hospital

    We were called in to give a quote to replace an existing preheat/precool coil wall that had been non-operational for years. Once released for the project, our engineering team dug deep into the needs of the hospital and their system. Upon further review, there was no need for the wall! Instead, the customer was able to use…

  • T-Mobile Headquarters – Building 2

    Design Build and TI build out of 145,000 SF Office TI (All floors have ceilings Open to Structure) with 2 Floors of Amenity Spaces and Two Skybridges adjoining three buildings. Floors 1 & 2 consist of Amenities with a full commercial kitchen, Pub bar, Starbucks café, multiple Restaurant Kiosk, refurbished Air Stream trailer and outdoor…

  • Lakeside Condos York-Shipley Boiler

    The Lakeside Condos date back to the Seattle World’s Fair in 1962. The original boiler, a York Shipley fire tube, was slated for demolition and replacement after 58 years of service. After reviewing the options to remove the old boiler and install new condensing gas boilers, MacDonald-Miller Facility Solutions suggested that the customer retube the…

  • Intergate Columbia Data Center

    The mechanical systems retrofits for these data center’s consisted of RTU replacements, plumbing upgrades, back-flow and capacity studies, water meter maintenance, controls upgrades, in addition to a standard preventative maintenance contract. The tenant had many challenges to overcome for their UPS (Uninterrupted Power Supply)  Room. Our scope of work included turnkey addition of supplemental cooling…

  • Suncadia Resort

    MacDonald-Miller completed tenant improvements for the kitchen, Pro Shop, and boiler upgrades for this deluxe resort. Additional scope included chiller and boilers repairs for the Lodge at Suncadia and 15 small boilers for the Suncadia Swim & Fit Center.

  • USAV Worthy

    At Vigor Shipyard in Portland, Oregon we recently worked on our first US Army vessel. The USAV Worthy (T-AGOS-14) is a Missile Range Instrumentation Ship operated by the United States Army. Our scope of work included equipment replacement and replacing galvanized pipe with stainless steel. Ship buffs might know that the USAV Worthy was previously…

  • Seattle Genetics – Building 6 & 7

    This will be the 6th (Building 6) and 7th (Building 11) major projects we’ve completed in the last 6 years with Seattle Genetics. Building 6 is a 2-story complete building overhaul for a new research and office facility for Seattle Genetics. Our client has a focus on maintenance and future flexibility, so keeping the mechanical…

  • Boiler

    PeaceHealth

    The PeaceHealth Sacred Heart Medical Center at RiverBend boiler project consists of retrofitting two 800hp Superior Boilers and installing a third new 800hp Hurst boiler. We are installing state of-the-art Limpsfield burners that are guaranteed to operate at 3% O2 emissions (15% excess air). That means they are very efficient and will provide energy savings…