The mechanical system for NE 8th is a combination of sensible cooling and compressorized cooling systems that include chiller water, heating water, and condenser water systems distributed throughout the building. The office floors are served by a dedicated outside air supply (DOAS) unit every other floor and zones will be conditioned by fan-powered sensible cooling…
-
-
Ovation Towers
Ovation Towers (Spring Street North block) are two twin residential towers in Seattle WA sporting 765,288 square feet of space. Each stand at 31 floors high with street and roof top amenity spaces, 558 apartment units, 8 floors of underground parking, and shell core space at street level for future office, restaurant, and retail. In…
-
Block 216
Standing at 460 ft tall, Block 216 is a milestone 35 floor tower exhibiting 158,000 sf of office space and includes the Pacific Northwest’s first Ritz Carlton with 138 Ritz Carlton branded residences, and 11 floors of five-star hotel space. Amenities span 4 floors and features a Ritz Carlton restaurant on the 20th floor along with a pool and jacuzzi on the 19th floor. It will be Portland’s 4th tallest building. This is…
-
Microsoft Thermal Energy Center
The Microsoft Thermal Energy Center is designed for a 10,500-ton chilled water plant with heat recovery and geothermal energy exchange to support the new East Campus Modernization, which consists of 17 new buildings (approx. 3,000,000 square feet) on a 72-acre site. This project features 875 geowells drilled 550 ft underground and uses the earth’s constant…
-
Yakama Nation Legends Casino & Hotel
The Yakama Nation Legends Casino and Hotel project consisted of 4 phases. The hotel scope of work for Phase 1 consists of 200 guest rooms served by vertical fan coil units fed by an air-cooled chiller, a shell and core spa fed by horizontal fan coil units and a pool area. A mechanical room on…
-
Seattle Genetics – Building 6 & 7
This will be the 6th (Building 6) and 7th (Building 11) major projects we’ve completed in the last 6 years with Seattle Genetics. Building 6 is a 2-story complete building overhaul for a new research and office facility for Seattle Genetics. Our client has a focus on maintenance and future flexibility, so keeping the mechanical…
-
700 DEXTER YARD
The building involves a new two tower 14-story office/R&D high rise building in Seattle WA. The project totals 213,000 SF of parking, 123,000 SF of R&D space and 414,000 SF of office that totals 750,000. The mechanical design concept utilizes a Sensible Cooling system that includes DOAS AHU’s, air cooled chillers, heat recovery chiller and…
-
Seattle Convention Center
The Seattle Convention Center Addition project doubles the size of the current Convention Center, with the additional facility boasting a 4,000-Ton Central Utility Plant. This project is just one block northeast of the existing center, which currently spans I-5 at Pike Street & 8th Avenue. The facility incorporates 1,250,000 square feet of convention space and…
-
FAA Northwest Regional Headquarters
The new FAA Northwest Regional Headquarters, also known as the Des Moines Creek Business Park Phase 2, is a state-of-the-art building featuring five stories of Class A office space. 300,560 gross square foot Class A office building consolidates federal tenants from four lease locations to a single building, and is leased to the GSA/FAA for a 20-year term….
-
Rainier Square
The project consists of three quarters of a city block, located at 5th & Union, and will redefine the remaining block around the existing Rainier Tower building. When completed, the 58-story tower will become the second tallest tower in downtown Seattle, trailing only the Columbia Center’s 76 floors. Rainier Square will include over 1.2 million…