MacDonald-Miller
    • Home
    • Design
      • Back
      • Engineering
      • Estimating
      • Detailing
      • Preconstruction
      • Integrated Project Delivery
    • Build
      • Back
      • Project Management
      • Prefabrication Shop
      • Special Projects
      • New Construction
    • Optimize
      • Back
      • Smart Building Services
      • Chiller Services
      • Plumbing Services
      • Electrical Services
      • Building Controls
      • Tab & Commissioning
      • Clean Buildings
      • Public Contracting
    • Projects
    • News
      • Back
      • News
      • Videos
      • Newsletters
    • About
    • Careers
      • Back
      • Overview
    • Contact
      • Back
      • Contact
    • Locations
    • Search
MacDonald-Miller
  • Services
    • HVAC Service & Maintenance
      • Smart Maintenance
        • Indoor Air Quality
      • Electrical Services
      • Plumbing Services
    • Building Performance
      • Building Controls
      • TAB & Commissioning
      • Energy Savings
        • Clean Buildings
        • ESCO & Financing
        • Public Contracting
    • Service Special Projects
      • Special Projects Service
        • Boiler
        • Chiller
      • Tenant Improvement & Retrofits
      • Equipment Repairs
  • Projects
  • News
  • About
  • Careers
  • Contact

Archive Archives

  • 700 dexter yard

    700 DEXTER YARD

    The building involves a new two tower 14-story office/R&D high rise building in Seattle WA. The project totals 213,000 SF of parking, 123,000 SF of R&D space and 414,000 SF of office that totals 750,000. The mechanical design concept utilizes a Sensible Cooling system that includes DOAS AHU’s, air cooled chillers, heat recovery chiller and…

  • Everett Museum of History

    Everett Museum of History

    The directors of the museum worked with MacDonald-Miller to perform a feasibility survey for the HVAC distribution systems, which included existing roof-mounted package air handling units. The renovation plan requires performing replacement of the five existing package air handling units that exceeded life cycle, installation of one new package air handling unit, distribution modifications and…

  • FAA Northwest Regional Headquarters

    FAA Northwest Regional Headquarters

    The new FAA Northwest Regional Headquarters, also known as the Des Moines Creek Business Park Phase 2, is a state-of-the-art building featuring five stories of Class A office space. 300,560 gross square foot Class A office building consolidates federal tenants from four lease locations to a single building, and is leased to the GSA/FAA for a 20-year term….

  • Boiler

    PeaceHealth

    The PeaceHealth Sacred Heart Medical Center at RiverBend boiler project consists of retrofitting two 800hp Superior Boilers and installing a third new 800hp Hurst boiler. We are installing state of-the-art Limpsfield burners that are guaranteed to operate at 3% O2 emissions (15% excess air). That means they are very efficient and will provide energy savings…

  • Rainier Building

    Rainier Square

    The project consists of three quarters of a city block, located at 5th & Union, and will redefine the remaining block around the existing Rainier Tower building. When completed, the 58-story tower will become the second tallest tower in downtown Seattle, trailing only the Columbia Center’s 76 floors. Rainier Square will include over 1.2 million…

  • Maritime Building Seismic Upgrade and Renovation

    Big Fish Games

    For this historical tenant improvement in the Maritime Building in downtown Seattle, MacDonald-Miller provided a new VAV system, DDC Controls and self-performed NEBB certified air balancing for Big Fish Games’ 5-story project. The plumbing scope included restrooms, hospitality bar and kitchenette, and MacMiller led a coordinated BIM process that included a highly collaborative detailing process…

  • WeWork, Tenant Improvement for Historic Portland Building

    WeWork

    For this 3-story tenant improvement project in Portland’s historic Power and Light Building, MacDonald-Miller had to respond quickly to propose, design and immediately start work to accommodate WeWorks’ tight deadline. Our HVAC scope of work includes a 4-pipe heating hot water and chilled waterfan coil units. We will implement in-house Honeywell controls, and the design…

  • Moxy Hotel

    MacDonald-Miller brings HVAC design-build services to downtown Portland. This new hotel tower in the center of downtown Portland includes 12 stories above grade and a single-story basement. It boasts 197 guest rooms and retail space. Graves Hospitality, is the developer with Howard S Wright as the general contractor. The Moxy Hotel is a relatively new brand…

  • Boeing Longacres

    MacDonald-Miller provided the following panel upgrades in response to the request from Boeing to upgrade the existing obsolete chiller panels and provide an alternate to the standard Original Equipment Manufacturer (OEM) deliverable.The upgrade allowed Boeing to receive equal performance and in some cases improvements above the factory OEM panel. When repairs occur this option can…

  • Leatherman

    Leatherman

    Leatherman, headquarters in Portland, Oregon, operates its 90,000 square feet high-tech manufacturing space round the clock.  Their existing control system was failing and replacement system options did not address energy efficiency.  MacDonald-Miller engineered a wireless Advanced Rooftop Control (ARC) solution that met the client’s cost and efficiency needs.  The web enabled ARC solution varied supply…

  • «
  • 1
  • 2
  • 3
  • 4
  • »

We make buildings work better.

Customer Login   Employee Login
© 2025 MacDonald-Miller. All rights reserved.