We’ve talked a lot about the 8th & Howell project, but now let us show you some of the MacMiller Capabilities in action:

 

The skid for this project was engineered, designed, coordinated, fabricated, welded, assembled, and installed by MacMiller.  The total weight of all fabrication and equipment was over 350,000 lbs, set in 2 just days.

Categories: General

We make buildings work better.