MacDonald-Miller
    • Home
    • Design
      • Back
      • Engineering
      • Estimating
      • Detailing
      • Preconstruction
      • Integrated Project Delivery
    • Build
      • Back
      • Project Management
      • Prefabrication Shop
      • Special Projects
      • New Construction
    • Optimize
      • Back
      • Smart Building Services
      • Chiller Services
      • Plumbing Services
      • Electrical Services
      • Building Controls
      • Tab & Commissioning
      • Clean Buildings
      • Public Contracting
    • Projects
    • News
      • Back
      • News
      • Videos
      • Newsletters
    • About
    • Careers
      • Back
      • Overview
    • Contact
      • Back
      • Contact
    • Locations
    • Search
MacDonald-Miller
  • Services
    • HVAC Service & Maintenance
      • Smart Maintenance
        • Indoor Air Quality
      • Electrical Services
      • Plumbing Services
    • Building Performance
      • Building Controls
      • TAB & Commissioning
      • Energy Savings
        • Clean Buildings
        • ESCO & Financing
        • Public Contracting
    • Service Special Projects
      • Special Projects Service
        • Boiler
        • Chiller
      • Tenant Improvement & Retrofits
      • Equipment Repairs
  • Projects
  • News
  • About
  • Careers
  • Contact

Archive Archives

  • Tim Griffith - Whatcom Village

    Whatcom Village

    MEP The Whatcom Village Project comprises four buildings, including two floors of assorted kitchen spaces and other amenities, within a larger east campus modernization project. MacDonald-Miller was contracted to do the HVAC, Plumbing, and Controls for each building. Within these buildings are 1,434 terminal units throughout the office space and 34 hoods filling up the…

  • Washington 1000

    Design-Build This project is a design-build 17-story office building with approximately 546,000 SF of space. There is a dual DOAS system with custom units from Scott Springfield. This project is a shell and core office building with amenities completed on Levels 1, 2, and 17. This LEED Gold building was designed with all the features…

  • Umoja Biopharma HQ

    Design-Build This 85,000 SF design-build tenant improvement for Umoja Biopharma is a 50/50 lab and office split on Floors 3, 4, and 5 of a 12-story R&D and office tower. Each floor has a dedicated exhaust and supply air handling unit. The mechanical design utilizes a hydronic heating and chilled water system to serve lab…

  • 35 Stone

    The 35 Stone project is a five-story, mixed-use development comprising 103,000 square feet of office space, 4,700 square feet of at-grade retail and restaurant spaces, and three levels of below-grade parking. The project is part of the Seattle Living Building Pilot Program, which aims to meet the highest sustainability and environmental standards. The building features…

  • U.S. Bank Center

    Mechanical The MacDonald-Miller team provided comprehensive mechanical systems design and installation services to redevelop key community spaces in the prominent multi-floor building. This project included the installation of new Air Handling Units (AHUs) and Fan Coil Units (FCUs) to service high-traffic areas such as Cedar Hall, the Spruce Room, and various common areas across the…

  • WSU – Building Systems Infrastructure Upgrades

    Design-Build The WSU Building Systems Infrastructure Upgrades Project is taking place across four campuses and 20+ buildings in Pullman, Prosser, Puyallup, and Spokane. Managing 19 separate buildings within a single project demanded exceptional organizational skills, strategic planning, and effective coordination to ensure each building’s unique requirements were met while maintaining a cohesive and unified project…

  • MultiCare Health Systems – Auburn Medical Center

    PLAN-SPEC This project consists of two existing patient towers (1975 and 1981). Both are currently fed from their own individual air-handling systems. During the preconstruction phase, MacDonald-Miller worked with MultiCare, Abbott, and the design team on a plan to minimize the impact on patient care by installing one new larger air handling system in a…

  • UW Medical Center Chiller Replacements

    PROJECT DESCRIPTION: Tenant improvement on a live hospital serving cancer care wards and compounding pharmacies. SCOPE OF WORK: MacDonald-Miller’s scope of work includes Engineering, Sheet metal, Fitting, and Controls. UNIQUE CHALLENGES: This project required a quick turnaround due to the patient needs and compounding pharmacy spaces served by the original units, which could not go…

  • Snoqualmie Casino Expansion

    Design-Assist MacDonald-Miller is providing full mechanical and plumbing scopes to serve a 460,000 square foot expansion to the existing Snoqualmie Casino. PROJECT: The building will consist of four podium levels consisting of loading dock, back of house offices, laundry room, banquet catering kitchen, a 2,000-seat entertainment venue and convention center, pool, fitness center, and spa….

  • Farwest Steel

    Design-Build Scope includes Design-Build HVAC system, TAB, plumbing, and controls. PROJECT: This design-build project involves the construction of a steel manufacturing facility in Post Falls, Idaho. This facility spans 6,900 SF of office space and over 100,000 SF of warehouse space. The project scope encompassed plumbing and mechanical for the facility, including a split HVAC…

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • …
  • 10
  • »

We make buildings work better.

Customer Login   Employee Login
© 2025 MacDonald-Miller. All rights reserved.