MacDonald-Miller
    • Home
    • Design
      • Back
      • Engineering
      • Estimating
      • Detailing
      • Preconstruction
      • Integrated Project Delivery
    • Build
      • Back
      • Project Management
      • Prefabrication Shop
      • Special Projects
      • New Construction
    • Optimize
      • Back
      • Smart Building Services
      • Chiller Services
      • Plumbing Services
      • Electrical Services
      • Building Controls
      • Tab & Commissioning
      • Clean Buildings
      • Public Contracting
    • Projects
    • News
      • Back
      • News
      • Videos
      • Newsletters
    • About
    • Careers
      • Back
      • Overview
    • Contact
      • Back
      • Contact
      • Locations
    • Search
MacDonald-Miller
  • Services
    • HVAC Service & Maintenance
      • Smart Maintenance
        • Indoor Air Quality
      • Electrical Services
      • Plumbing Services
    • Building Performance
      • Building Controls
      • TAB & Commissioning
      • Energy Savings
        • Clean Buildings
        • ESCO & Financing
        • Public Contracting
    • Service Special Projects
      • Special Projects Service
        • Boiler
        • Chiller
      • Tenant Improvement & Retrofits
      • Equipment Repairs
  • Projects
  • News
  • About
  • Careers
  • Contact

Macmiller News

  • News
  • Videos
  • Testimonials
  • Newsletters
  • Healthcare Initiative - MacDonald-Miller Facility Solutions

    An extremely healthy track record

    Interview with Ruben Cañas, Healthcare Project Director, from our Perspective newsletter Volume 5, Quarter 4 article: An extremely healthy track record. A lot of folks recognize MacDonald-Miller as the healthcare leader in the Seattle area – yet, where else are we doing work? Over the past several years we have positioned ourselves as the healthcare…

  • Contractor mag - Macdonald-Miller Facility Solutions

    Contractor Magazine: Energy Savings Purchasing Program

    Article published by Contractor Magazine: Making buildings work better. Seattle design-build contractor develops a new approach to financing energy-efficiency projects. SEATTLE — MacDonald-Miller Facility Solutions, a design-build contractor headquartered here, and the Snohomish County Public Utility District developed a new, comprehensive approach to overcoming the first-cost hurdles that many commercial building owners must deal with when making needed…

  • Sheet Metal Journal Fall 2017 - Macdonald-Miller Facility Solutions

    Sheet Metal Journal Western Washington

    We’re honored to be on the cover of Sheet Metal Journal Western Washington’s fall cover!  Project Spotlight: University of Washington Embraces Multi-Trade Racks.  MacDonald-Miller installed 58 multi-trade racks at the University of Washington, each approximately 6 feet wide by 14 feet in length. The racks accommodated sheet metal, plumbing,fitting, and electrical trades. Making the multi-trade…

  • 8th Howell TimeLapse

    8th & Howell Project Highlight Video

    We’ve talked a lot about the 8th & Howell project, but now let us show you some of the MacMiller Capabilities in action:   The skid for this project was engineered, designed, coordinated, fabricated, welded, assembled, and installed by MacMiller.  The total weight of all fabrication and equipment was over 350,000 lbs, set in 2 just…

  • King County Library System

    The Impact of HVAC Controls on King County Library System

    Interview with Greg Smith of KCLS Shared by Seattle Business Magazine What happens when you have 48 buildings to manage, all with their own specific challenges and all under constraints of a single budget? King County Library System (KCLS) knew there had to be a better way of managing their buildings. So how were they…

  • MacLens

    THE MACLENS ADVANTAGE

    MacLens HVAC Service Tech Tool Giving Customers Real-Time Visibility MacDonald-Miller is the first mechanical contractor in the PNW to offer the only integrated field service solution, which captures real-time photos & videos to our customer’s call summary reports – so they see exactly what they need in order to make informed decisions.  MacDonald-Miller service technicians…

  • Hawk Stadium

    Hawk Tower Project Overlooking CenturyLink Field

    STADIUM PLACE This two tower high-rise development located in Seattle’s historic Pioneer Square consists of a 23-story hotel tower and a 19-story office tower connected by an 8-story arcade/atrium with two sky bridges to connect both towers. Both phases of this high-profile project nearing completion. Phase I includes a hotel tower with a street level…

  • Filter Shop2

    MacMiller’s Filter Shop

    Many people don’t stop to truly consider what keeps the air in buildings fresh, clean and free of dust. They may be surprised to discover just how big a role air filters play behind the scenes. Filters are an unseen, yet very significant part of building performance – so important, in fact, that the technicians…

  • 8th Howell

    8th & Howell: A complex project

    The city of Seattle is known for its innovation and creativity, and MacDonald-Miller has been part of this forward-thinking mindset for decades. We’ve leveraged our technical expertise to become a major player in the ever-changing landscape of the Emerald City. A current initiative that reflects our level of ingenuity is the construction of the 8th…

  • LSE

    Tons of teamwork: Lincoln Square Expansion Central Plant

    This past January, the Lincoln Square Expansion Project brought the chilled water central plant online, which serves the entirety of the campus including a 31-story office tower, 41-story residential tower and 3-story retail podium. The central plant consists of (4) 750-ton centrifugal water chillers that are interconnected with the 3,000-ton cooling tower located at the…

  • «
  • 1
  • …
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • »

We make buildings work better.

Customer Login   Employee Login
© 2025 MacDonald-Miller. All rights reserved.