Your building deserves systems that will perform exactly as designed. Through rigorous testing, close collaboration with all project stakeholders, and ongoing performance verification, we’ll bring your building to life with maximum efficiency and long-term reliability.
Commissioning

Your Vision, Fully Operational
All Systems Go
The commissioning of your new building starts in the conceptual phase and continues through occupancy to one year post-construction. It’s a collaborative effort involving the owner, engineer, contractors, and commissioning agent. The process dynamically brings your static building to life – fully meeting your specified requirements and functional/operational needs.
Achieving, Verifying, Documenting
Our commissioning agent will follow the progression of your project – with a comprehensive checkout of the mechanical system from concept to occupancy, a review of conceptual and actual designs, verification of proper installation, and functional testing of the complete system.
Comprehensive Commissioning
Our process coordinates the traditionally separate functions of system documentation, equipment start-up, control system verification, calibration TAB, performance testing, and training. Weekly meetings ensure that the owner’s representative, general contractor, and all subcontractors are working together.