Heat Recovery Pump Skid
Healthcare Project: Polyclinic Nordstrom Tower
Design-Build  16,000 SF

The penthouse floor of this medical office building was demoed and a new Ambulatory Surgery Center (ASC) with four Class C operating rooms with support area was just completed in February of 2014.  The ASC includes a completely new self-contained mechanical infrastructure, installed with new 100% outside air and exhaust HVAC system complete with humidity control, HEPA, filtration, constant volume and VAV zone terminals with electric heat.  A new med-gas system was installed including oxygen, vacuum, and WAGD systems. The HVAC, plumbing, med-gas, and JACE Tritium DDC building automation system was designed and installed by MacDonald-Miller Facility Solutions utilizing our in-house resources including modeling and specialized equipment manufacturing at our shop.

“The interesting challenge that we met on this project was developing a cost effective design to meet a tight budget with a very aggressive schedule.  From the start of design to project turn-over was only four months.  This time frame included design drawings, Department of Health review, mechanical permits, demolition work, completed installation work and commissioning.” – Steve Amann, Account Executive

Categories: General

We make buildings work better.